Staff changes in the past month have included:
-Emily Boswell was appointed to the position of Staff Engineer. She worked as a Construction Inspector for Lakeland for the past 4 years on an Intern/part-time basis while she completed her B.S. in Engineering.
-James (Bart) Stimpson was hired as Wastewater Technician to replace Matthew David, who resigned to take another position. He previously worked for Mid-South Septic and is familiar with the Lakeland Sewer System and the lift stations. He also operated the same type of equipment he will be operating for Lakeland.
-Theresa Meyer, Executive Assistant, earned her Certified Municipal Clerk designation from the International Institute of Municipal Clerks. This indicates she has met specified education and experience requirements for the designation. She is one of 8 persons in Tennessee who recently received the designation.
Tuesday, June 03, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment