The City of Lakeland is accepting bids on construction of a new Wastewater Treatment Plant until November 22, 2005. (The original bid date of November 14 is being extended to November 22 to obtain more competitive bids.)
The Wastewater Treatment Plant is planned for the same location as the existing plant to minimize costs.
Current plans are for the new plant to go into operation in 2007 in time for the City to comply with Tennessee Department of Environment and Conservation (TDEC) regulations on water quality entering the Loosahatchie River.
Thursday, October 27, 2005
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment