Monday, January 01, 2007

Transportation Project: Construction of Beverle Revira Drive from Canada Road to Huff & Puff/Seed Tick

This project includes the extension of Beverle Revira Drive (the street in front of the Fire Station) to connect with Huff & Puff/Seed Tick Road. This will provide a better connection especially for residents along Seed Tick Road and will substantially improve safety.

Traffic Signals will be installed at the Beverle Revira Drive/Canada Road intersection as soon as possible.

STATUS: Construction Plans for Beverle Revira are complete. Currently obtaining roadway easement. This project is totally funded by the City of Lakeland.

Estimated construction date is in 2007.

The traffic signal schedule is currently unknown and will depend on when the road construction is completed and availabilty of funding.

No comments: